Installation instructions
Connecting your GULP
The GULP connects to your school's mains through an isolation valve and a buried 22 mm supply line. Have a qualified plumber do the work, in line with local municipal by-laws and SANS 10252.
01
School mains connection
A qualified plumber locates and confirms the connection point on the school's existing supply.
02
Isolation valve
Fit an isolation valve directly after the connection, in an accessible valve box, so the GULP line can be shut off without affecting the school.
03
Buried 22 mm line
Run a potable 22 mm line by the shortest practical route, with at least 300 mm (30 cm) cover from finished ground level to the top of the pipe.
04
Connect the GULP
Place the GULP on a level, firm base and connect the line at the unit inlet. A local stop valve at the unit is optional.
Before you backfill
Depth
Check cover with a depth gauge before laying and again before backfilling. Go deeper under driveways or where vehicles drive.
Protection
Bed the pipe in fine, stone-free material and keep it clear of sharp stones and other services. Add marker tape above the pipe.
Record
Photograph the open trench with a tape measure showing the depth, and mark the route on the site plan. Hand these records to the school.
Diagrams


Need help? WhatsApp us on 063 828 6466.
